From a derelict music shop to working offices in four weeks
SOSAD Ireland had to leave its Navan premises. The building it found had the right size and location, but had stood empty and neglected for years. Four weeks later it had offices and consultation rooms ready to use.
4 weeksJune to July 2021
Two floorsabout 140 m² of floor space
About 600 m²of walls and ceilings brought back
Officesand consultation rooms, built to their brief
01 · The building
Empty for years
In 2021, during the pandemic, SOSAD Ireland had to move its Navan branch out of the premises it was in. The building it found had the right size and the right location. It had once been a music school and a music shop, and it had stood empty and neglected for a long time.
The old shop floor.What the music shop left behind.
An upstairs room, before.Old carpet, old layout.
The state of the building when we arrived.Rot behind the window sills.
02 · How we got the job
Through a local business network
SOSAD Ireland’s general manager was a member of the same local business network as our founder, and offered us the project. We took on the whole fit-out. The electrical work was done by an electrical contractor from the same network.
03 · Strip-out
Clearing it out
The first job was getting everything out: old fittings, shop shelving, lights, carpet, timber and years of rubbish.
What came out of one room.
Clearing room by room.The first new partitions going up.
04 · A new layout
Partitions, acoustic insulation and rooms that fit the brief
We reworked the space to what SOSAD Ireland needed: new partition walls, acoustic insulation in the walls so conversations stay in the room, and offices and consultation rooms laid out to their brief.
Before.The same room: new wall, acoustic insulation in.
New openings being formed.The finished room.
Insulated partitions on the upper floor.A finished office.
05 · Finishing
Everything a working office needs
New toilets and a kitchenette, with new plumbing and drainage
Walls and ceilings repaired throughout
New internal doors, frames and skirting
Painting throughout
Kronoswiss 12 mm AC5 laminate flooring
The old toilet.The new toilets.
The stairs, before.The stairs, after.
The new corridor.Kronoswiss AC5 laminate throughout.
The new kitchenette.Ready to move in.
06 · Four weeks
Ready to move in
Four weeks after we started, SOSAD Ireland had a rebuilt, working space in Navan, laid out the way they needed it.