Case study · Galroostown, Drogheda, Co. Louth

From a damp, mould-filled rental to a warm, dry home

The brief was a bathroom, a deep clean and a coat of paint. Under the wallpaper we found a house falling apart. This is how we told the owner, what we changed and how a four-month rebuild ended.

4 monthsDec 2023 to May 2024
3 + 2our full-time team, plus two when needed
Whole interiorevery room, down to the brick
Since 2019from one ceiling light to a full rebuild

01 · December 2023

A rental bungalow nobody should have been living in

Tenants had lived here until a few days before we first walked in. The house was damp, uninsulated on the inside, covered in mould and fungus, and it smelled of it. The owner had already insulated the outside walls and called us for what he expected to be a refresh.

Mould spreading along the bottom of a bedroom wall in a rental bungalow, Galroostown, Drogheda
Bedroom wall, the day we first saw the house.
Black mould along a bedroom ceiling above the window
Mould along the bedroom ceiling.
Mould across the bathroom ceiling around the extractor fan
The old bathroom.

02 · The original brief

A bathroom, a deep clean, paint and new flooring

That was the plan. We started by running an industrial dehumidifier in the house for a full week to pull the moisture out, then treated the whole interior against mould and fungus before any other work.

Industrial dehumidifier running in the hallway of the bungalow
A week of industrial dehumidifying before anything else.

03 · 22 December 2023

Then we scratched the surface

Under four or five layers of old wallpaper the walls were black with mould. Plaster was falling away down to the brick. Behind the kitchen units, and behind the fridge, the wall and floor were rotten. The heating no longer worked, the internal doors and joinery were falling apart, and the old fuse board had to go.

Old wallpaper peeled back from a ceiling to reveal black mould underneath
Mould under the old wallpaper.
Wallpaper pulled away from a wall showing mould and water staining
Same story in the next room.
Wall and floor behind the old fridge, black with mould and rot
Behind the fridge: the wall and floor the day we moved it out.
Plaster crumbling away from a damp wall at skirting level
Plaster coming away to the brick.
Old fuse board with rewireable fuses
The old fuse board.

04 · Over Christmas

We brought the owner solutions, not just problems

We could have painted over it. Instead we called the owner, showed him everything we had found and put a way forward on the table for each problem, knowing he might say no. We would rather lose a job than hide a problem. Over Christmas and New Year we drew up a new project: a complete rebuild of the interior. He agreed, and at the end of January we came back and started stripping the house back to the brick.

Bathroom stripped back to bare blockwork with new plumbing runs
The bathroom, back to the brick.
Skip full of old kitchen, flooring and plaster from the strip-out
What came out of the house.

05 · February to May 2024

Rebuilt from the inside

  • Kitchen and bathroom stripped to the brick, wallpaper removed, a second anti-mould treatment, all old floor coverings lifted
  • New heating pipework and radiators throughout, connected to the existing oil boiler
  • New water supply and drainage
  • Insulated dry-lining: 37.5 mm insulated plasterboard on every external wall and 62.5 mm on the ceilings
  • Self-levelling screed on the floors
  • A full rewire, certified by our electrician
  • Skimming and painting throughout
  • New internal doors, frames, skirting and attic hatch
  • Floor tiles in the entrance and kitchen, Kronoswiss Castle Oak 12 mm AC5 laminate everywhere else
  • We also brought in a roofer to replace the gutters, soffits and fascia around the whole house
New heating pipework run along a stripped wall to the radiators
New heating pipework to every radiator.
Insulated plasterboard being lifted into place on the ceiling
Insulated dry-lining going up on the ceilings.
Self-levelling screed poured across a bedroom floor
Self-levelling the floors.
Hanex Silverstone solid acrylic worktop clamped while the joint cures
Joining the Hanex worktop on site.
Large marble-effect porcelain tiles going up in the new bathroom
Tiling the new bathroom.

06 · 11 May 2024

A warm, dry home again

The kitchen is a small room, so we made it to measure and used every centimetre: Finsa Amazona Roble with sprayed handleless fronts, Hanex Silverstone solid acrylic worktops and a white tiled splashback, with a washing machine, oven, induction hob and fridge all fitted in and real storage left over. The new bathroom has a shower enclosure with two showers, a rain-head mixer and an electric power shower, as the owner asked. In the living room we built a media wall with shelving and an integrated electric fire.

Media wall with oak-effect shelving, white cabinets and an integrated electric fire, Galroostown
Media wall with shelving and an integrated electric fire.
Small bespoke kitchen with handleless fronts and white solid acrylic worktop
Made to measure for a small room.
Kitchen corner unit with pull-out storage next to an integrated fridge
Corner storage that actually gets used.
Floor-to-ceiling kitchen pantry storage with oak shelving above a built-in oven, doors open
Floor-to-ceiling pantry storage, built into a small kitchen.
Shower enclosure with rain shower and electric power shower in marble-effect porcelain tiles
Two showers, as the owner asked.
Bathroom vanity and illuminated mirror cabinet with marble-effect porcelain tiles
The new bathroom.
Hallway with new tiled entrance, oak-effect laminate and new white doors
Entrance tiles, laminate and new doors.
Bright bedroom with new radiator, laminate floor and fresh paint
One of the bedrooms.
New fascia and soffit being fitted along the roofline of the bungalow
New gutters, soffits and fascia around the house.

07 · Since 2019

It all began with a single ceiling light

This owner was one of our first clients. In 2019, he contacted us to replace a ceiling light in his bungalow. That year, we also repainted the entire interior. Later, we tiled the hallway, and over the years, we completed a long list of projects, both small and large. The rebuild in 2024 wasn’t the first time we met; it was simply the next step in a relationship that had already lasted five years.

After working on the bungalow, we continued with projects at his home, including dry-lining the ceiling of a small extension, spraying the kitchen, repairing a drain, installing a white PVC boundary fence, and most recently, building a raised deck with a hand-charred timber pergola overlooking the estuary in Baltray.

Trust isn’t something a client grants you after the first job; it is developed gradually, one project at a time. This trust is built by respecting both the work and the client, no matter how small the job may be. Every task, whether it’s replacing a ceiling light or renovating an entire house, receives the same level of care. Credibility isn’t about what we say to a client’s face; it’s about what we do when they’re not watching—carrying out the job as agreed. That’s how one light turned into a complete home renovation and a client who continues to reach out to us.

More renovation work

Office fit-out for SOSAD Ireland, Navan, Co. Meath →Ensuite, Blackrock, Co. Dublin →Full renovations: what we do →All transformations →

Based in Drogheda, working across Dublin, Wicklow, Meath, Louth and Kildare.

Imagination.
Conversation.
Transformation.

NIXTOM consultationLet's talk.